Commercial

180 Wellington Street West

Mechanical Engineers
Electrical Engineers
Client:
RBC CBRE
Completed:
2013
 

HH Angus recently completed the mechanical and electrical retrofit of this 150,000ft2, 12-storey building in downtown Toronto.

Our project scope for the 40-year-old building included tenant fitout, building recladding and base building upgrades, fire alarm replacement, perimeter fan coil system replacement, emergency power system and normal power system upgrades, as well as humidification system upgrades.

A key design challenge was delivering on the client’s desire for increased visual transparency of the building’s exterior without creating a major penalty in energy efficiency. Our design team recommended a solution, and worked with the Architect to determine appropriate curtain wall components to achieve the client’s goal.